Plumbing is the first trade to commit in a bathroom renovation and the hardest to change later. Here is what to lock in with your plumber before tiling starts.

26 October 2026By Just Pro Plumbing
Bathroom Renovation Plumbing in Sydney: What to Sort Before the Tiler Arrives

Plumbing is the first trade to commit in a bathroom renovation and the one that is hardest to change later. The pipework goes in behind the walls and under the floor before waterproofing and tiling, so a decision skipped at this stage tends to resurface as an expensive fix once the tiles are down. Here is what to sort out with your plumber before the tiler arrives.

Finished modern bathroom with a marble shower and vanity

Why the Plumbing Comes First

A bathroom renovation follows a set order. After demolition, the plumber does the rough-in, which means running new water supply and waste pipes to where each fixture will sit. Waterproofing and tiling follow, and the plumber returns at the end to fit off the toilet, basin, shower and tapware. Everything behind a finished wall is fixed at rough-in, which is why the decisions below need to be made early.

Lock In the Layout

The biggest cost driver is whether fixtures move. Keeping the toilet, shower and vanity where they are means existing pipework can often be reused or lightly adjusted. Moving a toilet means new drainage with the correct fall back to the sewer connection, and moving a shower or bath means new supply and waste lines. Decide the layout before demolition and get it in writing, so the plumber, builder and tiler are all working from the same plan.

The layout also affects the paperwork. In NSW, on-site plumbing work generally needs a Notice of Work lodged so it can be inspected, but NSW Fair Trading lists bathroom renovations where the location of fixtures has not changed among the situations where a Notice of Work does not need to be supplied. If fixtures do move, expect an inspection to be part of the process.

Choose Fixtures and Tapware Before Rough-In

Rough-in positions depend on the actual products you choose. A wall-hung toilet needs an in-wall cistern frame and solid support behind the wall. A freestanding bath needs its waste and supply positioned to suit that exact model. Wall-mounted tapware and shower mixers need their outlets set at the right height and spacing. Buying fixtures after rough-in is one of the most common reasons plumbing has to be opened up again, so give your plumber the product specification sheets, not just a photo, before the walls close.

Check Hot Water Capacity and Pressure

A larger shower head, a rain shower or a new bath can ask more of your hot water system than the old fixtures did. Ask your plumber whether your existing system and supply pressure can handle the new setup, and whether the system is close to the end of its life. If it is, replacing it during the renovation is easier than doing it later, and our guide to repairing versus replacing a hot water system explains how to tell. Gas hot water also needs a licensed gas fitter, which we cover in our guide to licensed gas fitting in NSW.

Plan Access and Isolation

Ask for isolation valves so you can shut off water to the bathroom without turning off the whole house. If the renovation includes a concealed cistern, make sure there is proper access to the flush mechanism, since those parts eventually wear and need servicing. A little forward thinking now saves a wall being cut open years from now.

Floor Waste, Falls and Waterproofing

Water has to run to the floor waste, so the floor needs the right fall before waterproofing goes down. Waterproofing is its own trade with its own standards, and it sits between the plumber's rough-in and the tiler's work. Confirm with your builder who is responsible for each stage and in what order, and do not let the tiler start until the rough-in is finished and the waterproofing has been completed and allowed to cure.

Use a Licensed Plumber and Keep the Paperwork

In NSW, all plumbing and drainage work must be completed by a licensed plumber, and it is the plumber, not the owner, who completes the Notice of Work and the Certificate of Compliance where they apply. The Certificate of Compliance confirms the work meets the Plumbing Code of Australia and AS/NZS 3500, and it names the plumber responsible for it. Ask for your copy when the job finishes and keep it with your property records.

A Quick Checklist Before Tiling Starts

  • Fixture positions confirmed in writing and shared with every trade.
  • Product specification sheets for the toilet, basin, shower, bath and tapware given to the plumber.
  • Hot water capacity and water pressure checked against the new fixtures.
  • Isolation valves and service access planned, including for any concealed cistern.
  • New pipework tested before the walls are closed up. Ask your plumber to confirm this.
  • Waterproofing sequence agreed with the builder, with the plumber finished first.

Common Bathroom Plumbing Mistakes

  • Buying fixtures after rough-in. If the product does not match the pipework already in the wall, something has to be opened up and redone.
  • Changing the layout late. Moving a fixture after the pipes have been run adds new drainage, new supply lines and delays.
  • Finding out about hot water capacity on the first shower. Check it before the fixtures are chosen, not after they are installed.
  • Letting the tiler start early. Tiling before the plumber has finished the rough-in means tiles may need to come off again.
  • Using an unlicensed tradesperson to save money. It risks a failed inspection, no Certificate of Compliance and a repair bill that costs far more than the saving.

Almost every one of these comes down to the same thing, plumbing decisions being made too late. Settling them before demolition is the cheapest way to avoid them.

Servicing Sydney Wide and the NSW Region

Just Pro Plumbing is based in Ashfield NSW and services the Inner West, Eastern Suburbs, North Shore, Northern Beaches, Sydney CBD and Greater Western Sydney. Every plumber is licensed and insured, and all work comes with a 12 month warranty.

Planning a Bathroom Renovation?

Talk to a licensed plumber before the walls close. Get the layout, fixtures and hot water sorted first.

Call 0432 052 423 →

Frequently Asked Questions

Do I need a Notice of Work for a bathroom renovation in NSW?

NSW Fair Trading says a Notice of Work is not required for bathroom renovations where the location of fixtures has not changed. It generally applies when fixtures move. Your licensed plumber handles this, so ask them before work starts.

Can I move my toilet during a renovation?

Usually yes, but it needs new drainage with the correct fall, which affects cost and paperwork. Decide before demolition.

When does the plumber need to be on site?

Usually twice. First for the rough-in before waterproofing and tiling, then again to fit off the fixtures and tapware once the tiling is finished.

Do I need to upgrade my hot water system for a new bathroom?

Not always, but larger shower heads and baths can ask more of an existing system. Have your plumber check capacity and pressure before you choose fixtures.

Why does the Certificate of Compliance matter?

It is the record that the work meets the plumbing code and standards, and it identifies the responsible plumber. Keep your copy with your property records.

Need a plumber now?

We are available 24/7, every day of the week, for emergency plumbing services across Sydney and NSW.